Frequently asked questions

Clarify the key questions
before the project starts.

These answers help buyers assess the service direction and prepare useful inputs. Project scope, responsible entities and deliverables remain governed by the formal proposal and contract.

Question index

Browse by business and project stage.

01

Power Engineering

Feasibility studies, CHP, detailed engineering and operating-plant retrofits.

01What information is normally needed to start an industrial CHP feasibility study?

Normally: project location and objective, electricity and heat demand, fuel conditions, existing-system information and the owner's core decision question.

A discussion can begin before every dataset is complete. The first step can define the boundary, identify gaps and agree a collection plan before technical and economic comparisons are developed to the required depth.

Next step

Send the load, fuel and site information already available so that the study boundary can be framed.

02What is the difference between a feasibility study and detailed engineering?

A feasibility study supports decisions such as whether to build, which concept to use and the investment boundary. Detailed engineering converts an agreed scheme into discipline interfaces, equipment requirements and construction deliverables.

The two stages require different inputs and deliverables. The correct depth depends on project maturity, approval needs and the decision the owner must make, not only on the name of the document.

Next step

Tell us the current project stage and decision required so that the appropriate work depth can be discussed.

03Where should an operating-plant retrofit begin?

Start by defining the operating problem, retrofit objective and fixed boundaries, then verify existing equipment, system interfaces, operating data and outage constraints.

Retrofits are constrained by space, interfaces, operating modes and construction windows. Early diagnosis should confirm the source of the problem and what is implementable before a particular equipment solution is selected.

Next step

Provide the current-condition summary, key operating data and the problem to solve for a first information list.

02

Clean Energy Solutions

Thermal storage, solar and storage, biomass fuel handling and system integration.

01How should a thermal-storage concept be selected?

The concept must match the load profile, temperature level, charge and discharge period, site conditions, existing-system interfaces and operating strategy.

Different storage technologies suit different timescales and duties. The central question is not storage capacity alone, but how the system charges, discharges and works with the heat source and users over its operating cycle.

Next step

Prepare typical daily or seasonal load profiles, temperature parameters and existing heat-source information for initial screening.

02What early data matters most for a solar-plus-storage assessment?

Site and solar-resource conditions, the energy-demand profile, the existing electrical system, grid interface, operating objective and applicable local requirements are normally needed.

Available area or a target capacity alone is insufficient. Configuration depends on consumption, peak patterns, reliability targets and constraints in the existing system.

Next step

Send site information, load data and the existing electrical-system baseline so that gaps can be identified.

03What should be checked first for biomass fuel preparation and co-firing?

Fuel source and variability, moisture and particle size, storage and safety, boiler compatibility, preparation systems, emissions and operating constraints all need early review.

Fuel properties affect preparation, conveying, combustion and ash systems. The assessment should connect the supply envelope to the actual plant and operating objective instead of starting from a single machine.

Next step

Prepare representative fuel data, the intended co-firing ratio and existing-system information for technical review.

03

Equipment Sourcing & Procurement

Used turbine-generator evaluation and technical sourcing of new Chinese equipment.

01What parameters are needed before searching for a used steam turbine-generator set?

State the duty, target output, inlet and exhaust conditions, speed and frequency, operating mode, plant interfaces, delivery location and target timing.

Capacity alone is rarely enough. Candidate equipment must also be screened against the thermal system, electrical standard, foundations and layout, auxiliaries and the remaining usable condition.

Next step

Submit the key parameters and plant-interface conditions so that a technical sourcing brief can be prepared.

02Is every item shown by QIZHOU POWER owned inventory?

No. The current equipment business is primarily requirement-led technical sourcing and entrusted sales coordination; candidate items are not described collectively as owned inventory.

Ownership, location, condition, availability and the responsible transaction entity must be confirmed for each opportunity through documents and inspection. Unverified stock or performance claims are not used to attract inquiries.

Next step

Provide the equipment duty, key parameters and delivery conditions so that the feasible sourcing scope can be checked.

03What can equipment technical evaluation and procurement coordination include?

Depending on the agreed scope: requirement clarification, comparison of candidate equipment or suppliers, document review, inspection planning, and coordination of procurement and delivery interfaces.

Depth depends on the equipment type, available records, location and transaction structure. Final services, responsibilities and deliverables must be defined in the proposal or contract.

Next step

Describe the equipment type, procurement stage and the points where support is required.

04

Project Cooperation & Commercial Process

Project start-up, responsible entities, information transfer and international coordination.

01How are QIZHOU POWER, Jinan Qizhou Technology Consulting and Shandong Junminghe Engineering Design related?

QIZHOU POWER is the overseas market-facing brand, not a separate legal entity. Jinan Qizhou Technology Consulting Co., Ltd. coordinates overseas commercial work and requirement-led sourcing; Shandong Junminghe Engineering Design Co., Ltd. delivers agreed engineering-design scopes.

The legal entity that contracts, receives payment and carries delivery responsibility is confirmed in the proposal and contract. The brand never replaces the responsible contracting entity.

Next step

The responsible entity and interfaces will be confirmed before a formal proposal is issued.

02Must every document be ready before a project inquiry is submitted?

No. Start with the project location, type, stage, objective and requested support, then add information after the initial discussion.

More complete data improves scope definition, but the first inquiry mainly checks fit and identifies the next information required. Confidential or sensitive material should be transferred only after the method and permissions are agreed.

Next step

Email a short project outline to the project desk and the next questions can be organised from it.

03Can QIZHOU POWER support international power and energy projects?

International inquiries in power engineering, clean energy and equipment technical sourcing can be considered. Acceptance and delivery method are confirmed case by case against the country, project stage, site conditions, applicable standards and responsibility boundaries.

International projects may also require language, local-regulatory, design-interface, site-service and partner-allocation arrangements. A listed business scope is not an automatic commitment for every country or project.

Next step

State the country, current project stage and support needed so that an initial fit assessment can be made.